PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Grade area at Elev. 7-Stair -4,5 Footings (800x600).jpg Job Site during Pouring of concrete Facing South-East (800x600).jpg Pouring Concrete at Elev. 5-6 Shear walls 2nd Floor Facing South (800x600).jpg Pouring Concrete at Elev. 5-6 Shear walls 2nd Floor Facing South-East (800x600).jpg Pouring Concrete at Monumental Stairs wall forms Facing South (800x600).jpg Stripped Elev. 1,2,3 Facing East(800x600).jpg
Previous pageNext page Pouring Concrete at Monumental Stairs wall forms Facing South (800x600)
Pouring Concrete at Monumental Stairs wall forms Facing South (800x600)